Q1. Two companies are merging Both companies have IBM DB2 LUW running The Qhk Replicate administrator must merge a database (12 TB of data) into an existing database (15 TB of data). The merge will be done by IBM load. Which approach should the administrator use?
A.Stop task, finish IBM load, reload target
B. Stop task, wait until IBM load finishes, and then resume the task
C. Continue to run the task
D. Create a new task after finishing IBM load
Correct Answer: B
Q2. In Qlik Enterprise Manager Analytics, which messages can be seen in the GUI?
A.Server settings
B. Server-specific trends, specify to a task
C. Task-specific trends, specify to a task
D. Server and task trends
Correct Answer: D
Q3. Which are valid source endpoint types for Qlik Replicate change processing (CDC)? (Select two )
A.Classic Relational RDBMS
B. MS Dynamics direct access
C. SAP ECC and Extractors
D. Generic REST APIs Data Lake file formats
Correct Answer: A, C
Q4. When running a task in Qlik Replicate (From Oracle to MS SQL), the following error message appears: Failed adding supplemental logging for table "Table name" Which must be done to fix this error?
A.Contact the Oracle DBA
B. Check the permission on the target endpoint
C. Enable supplemental logging
D. Check the permission of the source endpoint
Correct Answer: C
Q5. Which files can be exported and imported to Qlik Replicate to allow for remote backup, migration, troubleshooting, and configuration updates of tasks?
A.Task CFG files
B. Task XML files
C. Task INI files
D. Task JSON files
Correct Answer: D
$ 39
Reviews
There are no reviews yet.