Q1. Which of the following must be considered in order to meet Energy and Atmosphere Prerequisite, Fundamental Refrigerant Management if the tenant requires 24-hour cooling in a server room?
A.Base-building chiller specifications
B. CFC-free refrigerants in tenant cooling units
C. Temperature monitoring of building cooling water
D. ENERGY STAR compliant cooling units with low CFCs
Correct Answer: B
Q2. The project material costs for Building Product Disclosure and Optimization cost-based credits are
A.actual costs, furniture included
B. default costs, 30% of total construction cost
C. actual costs, furniture optional
D. default costs, 40% of total construction cost
Correct Answer: C
Q3. When attempting Regional Priority Credit, Regional Priority what must be provided in the documentation?
A.Location
B. Climate zone
C. ENERGY STAR score
D. Heating and cooling degree days
Correct Answer: A
Q4. In addition to the basic requirements for Energy and Atmosphere, Fundamental Commissioning and Verification, which is required to achieve Energy and Atmosphere, Enhanced Commissioning, Option 1?
A.Develop and implement a commissioning plan
B. Review the contractor's submittals for compliance with design documents
C. Verify the installation and performance of the systems being commissioned
D. Review the owner's requirements and the basis of design for clarity and completeness
Correct Answer: B