Q1. The proposal consists of. - 3 HPE Synergy 12000 frames - 6 HPE Composer 2 modules - 2 HPE Virtual Connect SE 100 GO F32 Module - 4 HPE Synergy 50 GO interconnect Link Module Which statements about this proposed design are true? (Select two.)
A.The selected interconnect modules do not provide the requested WWN virtualization
B. HPE Synergy 50Gb ILMs must be replaced with HPE Virtual Connect SE 100 GO F32 modules
C. The current setup can support up to 18 HPE Synergy 480 Gen10 Plus compute modules
D. FC upgrade licenses for HPE Virtual Connect SE 100 GbF32 Module must be added
E. Remove 4 HPE Composer 2 modules from the design, as they are not required
Correct Answer: B, D
Q2. Your customer plans to manage HPE Primera using HPE Oneview Which storage management tasks can be completed using HPE OneView for this environment?
A.CPG management
B. Volume provisioning
C. Cache management
D. Replication setup
Correct Answer: B
Q3. You plan to configure a Link Aggregation Group (LAG) for two connections within a server profile for a compute node running an ESXI system. What is required from the VMware side to enable LAG?
A.Virtual Distributed Switch
B. vSphere Standard license
C. Load balancing cluster
D. Dedicated VMKernel port
Correct Answer: D
Q4. Your customer wants to compare HPE Superdome Flex with HPE Superdome Flex 280. Which statement about these two systems is true?
A.Only HPE Superdome Rex 280 can be managed using HPE OneView
B. Only HPE Superdome Flex supports HPE Persistent Memory
C. Only HPE Superdome Flex 280 can support multiple nPars
D. Only HPE Superdome Flex supports 32 sockets and 48TB of memory
Correct Answer: A
$ 39
Reviews
There are no reviews yet.