Q1. You are attending a job interview for a position as a web designer. The interviewer asks you to explain the reasoning behind using your particular design approach. Which of the following supports your preference for the bottom-up design approach?
A.This approach maximizes page view and conversions.
B. The design approach is centered around the needs and experiences of the users. If they are satisfied with their experience, they will continue to visit in the future.
C. When designing, create an exciting and vibrant experience for the users. Go bold or go home!
D. The sites are based on a central vision and design concept. After establishing this design base, the focus is then on how to direct users to the parts of the site they need to see.
Correct Answer: D
Q2. You are working through the TAR process. Which phase of the web design process are you currently working?
A.Development
B. Delivery and Maintenance
C. Planning
D. Testing
Correct Answer: B
Q3. You have built a website that incorporates responsive web design. However, Google has notified you that your site is not mobile-friendly. They report that several links are too close together. Which of the following practices will resolve this issue?
A.Optimize for touchscreen gestures
B. Modify all links to text
C. Modify all links to graphics
D. Arrange the links to different areas of the page
Correct Answer: A
Q4. Thomas and his web design team hurried to complete a 1,000 page data driven web site to meet and exceed the customer's expectation of delivery of a final project. Upon final testing of the site with the customer, Thomas discovered several of the features on the site did not work or provided inaccurate results. A great deal of time is required to go back and correct the mistakes. What is the most probable cause for these errors?
A.Data driven web sites are best suited for smaller sites and may cause errors in larger projects.
B. The team failed to build and test a prototype of the site early on in the project.
C. The customer had set unrealistic expectations that could not be met by the design team.
D. The wireframe of the project was modified throughout the project creation, causing inconsistencies.
Correct Answer: D